TOC : Report Design > Master/Detail Report >

 

Using master/detail dataset

<< Click to Display Table of Contents >>

Navigation:  »No topics above this level«

TOC : Report Design > Master/Detail Report >

 

Using master/detail dataset

 

 

To create a master/detail relationship between bands, set the master/detail relationship between their datasets. The detail band always has to be located below the master band.

 

Create two data bands side by side consecutively. Set the "Dataset" of the first data band to Masterset, and that of the second Data Band to detailset. The master-detail connection between the bands will be established as the name of the first data band is automatically entered in the "Masterband Name" property of the second Data Band.